Company was renamed to Doosan Škoda Power a.s. and listed on the Prague Stock Exchange
200 MW WtE in operation
1,100 MW turboset (nuclear) modernized
Opening of a new global R&D center within a Turbogenerators Business Group
Company was renamed into Doosan Škoda Power
Škoda Power became a proud part of Doosan
660 MW USC unit contracted
Škoda Power establishes a subsidiary in India – Škoda Power Pvt. Ltd.
Manufacturing 1,000 MW turboset (for Temelín Nuclear Plant)
500 MW steam turbines introduced
First 220 MW turboset (nuclear) in operation
First 200 MW turboset manufactured
110 MW steam turbine manufacturing begins
Development of 23 MW reheating steam turbine
Rateau turbine system replaced with turbines designed by Škoda
The first 412 kW steam turbine made for Rateau
Emil Škoda founded an engineering workshop